    Q: What is the purpose of a road pavement?

    A) To provide a durable surface for traffic
    B) To store groundwater
    C) To support building roofs
    D) To measure road temperature

    Q: Which layer of a flexible pavement is directly below the wearing surface?

    A) Subgrade
    B) Natural soil only
    C) Base course
    D) Foundation footing

    Q: What is subgrade in highway construction?

    A) The prepared soil foundation supporting the pavement structure
    B) The top asphalt layer
    C) The concrete curb only
    D) The road drainage pipe

    Q: What is the main purpose of road camber?

    A) To increase traffic speed directly
    B) To reduce road width
    C) To increase vehicle weight
    D) To facilitate drainage of rainwater

    Q: What is the purpose of a road shoulder?

    A) To replace the pavement completely
    B) To provide lateral support and an area beside the traffic lane
    C) To store drinking water
    D) To support building columns

    Q: Which test is commonly used to evaluate the hardness and toughness of aggregates for road construction?

    A) Los Angeles abrasion test
    B) Slump test
    C) Vicat test
    D) Proctor test

    Q: What does CBR stand for in highway engineering?

    A) Concrete Base Resistance
    B) Compacted Bearing Road
    C) California Bearing Ratio
    D) Central Base Ratio

    Q: The CBR test is primarily used to evaluate?

    A) Cement setting time
    B) Strength of subgrade soil for pavement design
    C) Concrete slump
    D) Steel tensile strength

    Q: What is the purpose of a bituminous binder in flexible pavement?

    A) To bind aggregate particles together and provide waterproofing
    B) To increase soil porosity
    C) To reinforce concrete beams
    D) To measure traffic volume

    Q: What is traffic volume?

    A) Weight of one vehicle
    B) Width of a road
    C) Length of a bridge
    D) Number of vehicles passing a point during a specified period

    Q: What is the main function of a bridge?

    A) To store water only
    B) To provide a passage over an obstacle
    C) To support a building roof
    D) To improve soil compaction

    Q: Which part of a bridge transfers loads to the ground?

    A) Road marking
    B) Handrail
    C) Foundation and substructure
    D) Expansion joint only

    Q: What is an abutment in a bridge?

    A) A central traffic signal
    B) A structure supporting the ends of a bridge and retaining approach fill
    C) A road drainage pipe
    D) A pavement marking

    Q: What is a pier in a bridge?

    A) An intermediate vertical support
    B) A pavement layer
    C) A drainage channel
    D) A road shoulder

    Q: What is the purpose of an expansion joint in a bridge?

    A) To increase concrete density
    B) To prevent all structural movement
    C) To support traffic signals
    D) To accommodate movement caused by temperature and other effects

    Q: What is quantity surveying mainly concerned with?

    A) Measurement, costing and management of construction work
    B) Only soil testing
    C) Only structural design
    D) Only traffic control

    Q: What is a Bill of Quantities?

    A) A concrete testing report
    B) A document listing measured items of construction work and their quantities
    C) A soil classification chart
    D) A weather report

    Q: What is the main purpose of a construction schedule?

    A) To plan and control the timing of project activities
    B) To determine concrete color
    C) To measure soil permeability
    D) To calculate rainfall only

    Q: What is the critical path in project management?

    A) The sequence of activities determining the minimum project duration
    B) The shortest physical road on a site
    C) The safest walking route
    D) The path used by construction vehicles only

    Q: What does CPM stand for in project management?

    A) Construction Planning Model
    B) Concrete Production Method
    C) Critical Path Method
    D) Central Project Measurement